ROSS MILLER
  • HOME
  • ABOUT
    • CURRICULUM VITAE
  • WORK
    • ARCHITECTURE >
      • RESIDENTIAL >
        • Modern Shotgun Duplex
        • Hygge ADU
        • Modern Shed ADU
        • Wabi-Sabi ADU
        • Backyard Renovation
        • A-Frame Cabin
        • 9126 Shirley Street Front Facade
        • 2411 Bretigne Drive Basement
        • 6000 The Knolls Front Entry
        • Benson ADU Renovation
        • SAE - Lambda Pi Chapter
        • Bachaus
      • COMMERCIAL >
        • 8800 F Street Front Entry Addition
        • Johnny Carson Center for Emerging Media Arts
        • Sentara Healthcare - Norfolk General Hospital
        • Fred & Pamela Buffett Cancer Center
        • Bellevue University Science Labs
        • AIA Nebraska / LHDC Offices
        • UCH Expansion Tower
        • PAL • ATE
      • MIKE NESBIT STUDIO >
        • THE BLUES
        • Textured Blue
        • FLOOD
    • PRODUCT DESIGN >
      • AIA Recognition: Leadership Series
      • AIA Recognition: Trophy Series 2.0
      • Amen's Liquor Store Counter
      • CAFA Recognition: Trophy Series
      • AIA Recognition: Trophy Series
      • Coffee Table
      • I Beam Table
    • SPECULATIVE >
      • Maruma -Li Mayan Hospital & Bush Medicine Center
      • Aboriginal Ear Clinic
      • Aboriginal Medical Relief Facility
      • TEA STATIONS
      • Interpretive Bridging
    • PHOTOGRAPHY
    • GRAPHIC DESIGN >
      • AIA Nebraska EP Committee Drink & Draw 2.0
      • 2014 AIA Nebraska Annual Conference
      • 2013 AIA Nebraska Annual Conference
      • AIA Nebraska FORM Mentorship Program
      • RJM_MPH Furniture
      • 2012 AIA Nebraska Annual Conference
      • SA[TIRE]
    • INTERACTIVE DESIGN >
      • Meyer Foundation for Disabilities
      • AIA Omaha
  • RECOGNITION
    • AWARDS + HONORS
    • LECTURES + PRESENTATIONS
    • JURIES + SELECTION COMMITTEES
    • EXHIBITIONS
    • PUBLICATIONS
  • CONTACT
  • MAPLE ST. CONSTRUCT

PROJECT LIST

SIGMA ALPHA EPSILON - LAMBDA PI CHAPTER HOUSE RENOVATION
UNIVERSITY OF NEBRASKA-LINCOLN
LINCOLN, NE
HDR

JOHNNY CARSON CENTER FOR EMERGING MEDIA ARTS
UNIVERSITY OF NEBRASKA-LINCOLN
​LINCOLN, NE
HDR

RIVER'S EDGE PARKING GARAGE
COUNCIL BLUFFS, IA
HDR

OMAHA NORTH HIGH SCHOOL FOOTBALL STADIUM STUDIES
OMAHA, NE
HDR

SENTARA HEALTHCARE - NORFOLK GENERAL HOSPITAL
NORFOLK, VA
HDR

KUWAIT CORRECTIONAL FACILITIES COMPLEX
KUWAIT CITY, KUWAIT
​HDR

CONFIDENTIAL TECHNOLOGY CLIENT - DATA CENTER OFFICE SPACE
PRYOR, OK
​HDR

BELLEVUE UNIVERSITY SCIENCE LABS
BELLEVUE, NEBRASKA
HDR

The Bellevue University Science Labs are located on the Bellevue University campus in the R. Joe Dennis Learning Center, originally constructed in 1992.  A 10,000-square-foot renovation of the Science Department reconfigured the size of the labs and the total teaching space while upgrading technology and equipment throughout.  Collaboration spaces and flexible furniture foster increased connections between students and professors to stimulate new ideas.  The new labs are uniquely designed around students, not faculty, providing students with more hands-on research opportunities.  The labs are divided into four areas:  Chemistry & Biochemistry, Microbiology, Anatomy & Physiology, and Student Research & Demonstration.
​
The reconfiguration of the labs allowed access to natural daylight.  Placing science on display, the design provides a minimal and transparent solution with clear visibility into the four teaching labs from the main ‘Science Corridor’.  The continuous glass façade of the labs and seating activates the corridor, promoting collaboration outside of the classroom, further increasing opportunities to interact and learn.  A simple finish palette throughout the project uses natural maple, gray epoxy countertops, gray rubber flooring, white paint, and pops of yellow to focus attention to activity occurring within the space.


Date of Completion: 2016
Project Cost:  $2,400,000
Project Size:  $10,00 SF

PRIVATE RESIDENCE
RULO, NEBRASKA
HDR

​For years the clients have been salvaging mid – 19th century Nebraska farmsteads from farmers who want to destroy the abandoned buildings to make way for valuable crop lands and have finally decided to put the salvaged materials to good use. These salvaged materials will be reused along with new materials to construct a modern homestead that pays homage to the farmsteads of the area by exposing the raw and natural beauty of the materials.

Date of Completion: Anticipated Fall 2017
Project Cost: $3,000,000
Size:  10,000 SF

FRED & PAMELA BUFFETT CANCER CENTER
THE NEBRASKA MEDICAL CENTER / UNIVERSITY OF NEBRASKA MEDICAL CENTER
OMAHA, NEBRASKA
HDR


When completed it will be a comprehensive cancer center that combines cancer research with cancer care.  The project will include a cancer research tower, a cancer clinic and inpatient hospital, and ambulatory care.

Date of Completion: 2017
Project Cost: $370 Million
Size:  577,000 SF

EDUCATION ABROAD DEPARTMENT OFFICES
UNIVERSITY OF NEBRASKA-LINCOLN
LINCOLN,  NEBRASKA
HDR


A renovation of that moved the Education Abroad Department to a new office space within Love Library, which included new offices, reception, kitchenette, and a conference room.

Date of Completion: 2015
Project Cost: N/A
Size:  N/A

HUMBER RIVER HOSPITAL
TORONTO, ONTARIO
HDR


When completed HRH will be the largest acute care hospital in the Greater Toronto Area and the first fully digital hospital in North America.

Date of Completion: Under Construction (Expected 2015)
Project Cost: $2 Billion USD
Size: 1,700,000 SF

HAMILTON HALL CHEMISTRY DEPARTMENT STUDENT RESOURCE CENTER
UNIVERSITY OF NEBRASKA-LINCOLN
LINCOLN,  NEBRASKA
HDR


A renovation of the Student Resource Center for the Chemistry Department, which included flexible workspaces and learning center, computer lab, collaborative “huddle” rooms, and department offices.

Date of Completion: 2013
Project Cost: $500,000
Size:  4,400 SF

AIA NEBRASKA / LHDC OFFICES
LINCOLN,  NEBRASKA
HDR


A tenant fit-up office renovation for two entities with shared amenities in a historic warehouse building.

Date of Completion: 2013
Project Cost: $273,000
Size: 2,000 SF

UNIVERSITY OF COLORADO HOSPITAL EXPANSION TOWER
AURORA, COLORADO
HDR


New 12-story inpatient tower, which doubled the size of the Emergency Department, added 144 beds, and a rooftop helipad for transporting emergency patients.

Date of Completion: 2013
Project Cost: $400 Million
Size: 795,000 SF

[PAL • ATE]
OMAHA, NEBRASKA
HDR


“Elevation Station” designed for an event, elevATE, a first-of-its kind dinner celebration that married local chefs and local designers.

Date of Completion: 2012
Project Cost: $2,000
Size: 300 SF
© 2024 Ross Miller